Select Page

Supplied and installed Leeds, Bradford

This project started as a problem with a damp floor in a brand new house. The builders had been in a hurry to sell the house and layed a laminate plank onto a concrete floor that had not dried out, and therefore all of the planks started lifting at the edges within weeks of the owners moving in.

Firstly we used F.Ball, F 75, 2 coat epoxy resin damp proof membrane with the appropriate screeds to deal with the damp problem and then finished the job by laying Kanrdean Opus SP215 Ferra tiles with a 3mm silver metalic design strip.